用mfc完成AOE,
1.判断工程是否可行
2.求出工程每个活动的最早开始时间e(i),最迟开始时间l(i)和全工程可以完成的最早时间
3.画出AOE网络和关键路径-Complete with mfc AOE, 1. Determine engineering feasibility 2. Obtain engineering earliest start time for each activity e (i), latest start time l (i) and the whole project can be completed the earliest time 3. Draw AOE network and critical path
1.判断工程是否可行
2.求出工程每个活动的最早开始时间e(i),最迟开始时间l(i)和全工程可以完成的最早时间
3.画出AOE网络和关键路径-Complete with mfc AOE, 1. Determine engineering feasibility 2. Obtain engineering earliest start time for each activity e (i), latest start time l (i) and the whole project can be completed the earliest time 3. Draw AOE network and critical path