当本地区达到最大负荷1980+i956MVA时,如果电网能保证按最大运行方式
运行,具备理想的最大供电能力,则容载比为1.2一订.0,电网各供电小区容载比不
均衡,靠各小区之间110KV联络线进行负荷调整也难以达到均衡。-When the maximum load 1980+i956MVA the region, if the grid can guarantee operation at the maximum operating mode, with the ideal maximum power supply capacity, capacity-load ratio of 1.2 a set. 0, the power supply grid cell capacity-load ratio is not balanced, relying on the 110KV tie lines between cells is difficult to achieve a balanced load adjustment.
运行,具备理想的最大供电能力,则容载比为1.2一订.0,电网各供电小区容载比不
均衡,靠各小区之间110KV联络线进行负荷调整也难以达到均衡。-When the maximum load 1980+i956MVA the region, if the grid can guarantee operation at the maximum operating mode, with the ideal maximum power supply capacity, capacity-load ratio of 1.2 a set. 0, the power supply grid cell capacity-load ratio is not balanced, relying on the 110KV tie lines between cells is difficult to achieve a balanced load adjustment.
(系统自动生成,下载前可以参看下载内容)
下载文件列表
xiaobofenxi.doc