文件名称:Power-system-risk-assessment
介绍说明--下载内容均来自于网络,请自行研究使用
电力系统风险评估方法和应用实例研究,介绍一种新的可用于电力系统规划、设计、运行及维护领域风险评估的方法。该方法强调工程应
用, 探讨电力系统的实际问题。根据规划、运行、维修和资产管理方面的不同要求, 发展特定的概念、针
对性的方法和实施步骤, 如提出元件老化失效模型、共因停运的分离模型及元件组停运模型等新概念。通
过对加拿大某城市电力系统扩建规划实例的分析, 说明如何进行具体工程的可靠性概率评估, 以达到资源
的最佳配置, 使系统风险保持在目标水平。
-Power system risk assessment methodologies and case studies to introduce a new can be used for power system planning, design, operation and maintenance of the field of risk assessment approach. The approach emphasizes engineering applications to explore the practical problems of the power system. According to the different requirements of the planning, operation, maintenance and asset management, development of specific concepts, and the targeted approach and implementation steps, such as component aging failure model, the outage model and a new concept common cause outage separation models and components group . Instance of the power system expansion planning of Canadian cities shows how the reliability of the probability of a specific project assessment, in order to achieve the optimal allocation of resources, so that the system risk is maintained at the target level.
用, 探讨电力系统的实际问题。根据规划、运行、维修和资产管理方面的不同要求, 发展特定的概念、针
对性的方法和实施步骤, 如提出元件老化失效模型、共因停运的分离模型及元件组停运模型等新概念。通
过对加拿大某城市电力系统扩建规划实例的分析, 说明如何进行具体工程的可靠性概率评估, 以达到资源
的最佳配置, 使系统风险保持在目标水平。
-Power system risk assessment methodologies and case studies to introduce a new can be used for power system planning, design, operation and maintenance of the field of risk assessment approach. The approach emphasizes engineering applications to explore the practical problems of the power system. According to the different requirements of the planning, operation, maintenance and asset management, development of specific concepts, and the targeted approach and implementation steps, such as component aging failure model, the outage model and a new concept common cause outage separation models and components group . Instance of the power system expansion planning of Canadian cities shows how the reliability of the probability of a specific project assessment, in order to achieve the optimal allocation of resources, so that the system risk is maintained at the target level.
(系统自动生成,下载前可以参看下载内容)
下载文件列表
电力系统风险评估方法和应用实例研究.pdf