搜索资源列表
Dongtai
- 3机9节点电力系统仿真,发电机数学模型,暂态稳定计算-power system simulation by 3 generators and 9 buses
3ji9jiedian
- 3机9节点算例,拓扑、参数均参照现代电力系统分析例6-3,Node9,Branch9节点支路数据PF_ji解潮流Create_Y节点导纳矩Create_Jac雅可比矩阵zantai暂态仿真-The example are referring to modern power system analysis example 6-3, Node9, Branch9 branch node data、 PF_ji Solutions trend
新建文件夹 (2)
- 故障仿真;提取故障分量;采用了分布参数模型;(It can be used for fault analysis, the distribution parameter line model is established, and the fault component is extracted)
m文件
- WSCC 3机9节点系统机电暂态仿真(Three machine nine node)
含汽轮机&水轮机的IEEE 3机9节点仿真系统_PSCAD
- IEEE标准3机9节点模型,可用于暂态分析;包含典型汽轮机和水轮机驱动的同步机。(The 3 source and 9 nodes model of IEEE , which can be used for transient analysis; Including synchronous machine driven by typical water turbine or steam turbine.)
run009
- 3机9节点系统仿真程序,基于psat数据格式(A simulation program based on psat data form)
3机9节点系统
- PSASP三机九节点仿真工程,适用于7.0版本。(PSASP three machine nine node simulation project is suitable for version 7.)
three_machines_nine_buses
- 电力系统三机九节点模型,基于模块搭建的仿真、simulink(Power system three-machine nine-node model, simulation based on module construction, simulink)
pro
- 基于matlab/simulink的5机14节点和3机9节点仿真(base on matlab/simulink 5 machine 14 node and 3 machine 9 node simulation)
暂态稳定分析程序
- 在本次仿真中,引用了WSCC 3机9节点的经典多机模型,并且对该模型在发生三相金属性短路故障的情况下,利用隐式积分法分析其暂态稳定状况。(In this simulation, the classical multi-machine model of 9 nodes of WSCC 3 is used, and the implicit integration method is used to analyze the transien
电力系统暂态稳定分析程序1
- 本程序是暂态稳定分析程序,3机9节点模型,对其在pt时刻7号节点发生三相短路故障,并在ct时刻将故障切除进行仿真,最后绘出2号和1号发电机的功角差与时间的关系曲线。发电机模型采用三阶模型,忽略阻尼,电枢电阻取为零;励磁系统仅有量测和放大环节,忽略反馈和电压调节器;负荷采用恒定阻抗负荷。(This program is a transient stability analysis program, three machine nine n