搜索资源列表

  1. Ch7_KeyWorkpiece

    0下载:
  2. N项作业的流水车间作业排序问题,使用关键工序法取得近优解。(In the flow shop scheduling problem of N item, near optimal solution is obtained by using the key procedure method.)
  3. 所属分类:matlab例程

源码中国 www.ymcn.org